Order of Magnitude

The Factor of 10

You have probably heard about this, maybe this is already well known in your group, but it deserves revisiting.

When a problem is found during design and development, long before any large amount of money is spent, the cost for introducing a change (outside of crushing ego) is the salaries during the change. Let’s say for argument’s sake this will cost $1,000 of company paid time.

What happens if the team missed this opportunity and built the prototype? Prototypes are used for verification of requirements and validation with users. This comes at a large cost in terms of time, effort, hiring focus groups or dedicating production teams for testing. Finding a problem at this level is about 10x the design cost, or about $10,000.

The worst has happened. The project went to pilot and a failure was found in the pilot run. This failure is now out in the wild, as pilot runs are often the first introduction of a new product to the world. This issue, while small, not only causes a recall and compensation to the customer, it impacts the brand in ways that are not measurable. The recovery plus the repeat of the pilot (ignoring completely the cost of the engineers, testing, shipment and compensation of supply chain) is over one hundred thousand dollars. This doesn’t take into account the loss in sales, the annual impact of revenue, or the distributors that might not be interested in a repeat performance.

Catastrophic failure is when the product passes through pilot and goes to mass production. Failure here can close a company, but a minimum dollar amount here is in excess of ONE MILLION DOLLARS. That’s a modest minimum. This level of failure can be unrecoverable.

Use tools to ferret out errors early – do the testing, use your statistics and above all, leverage risk analyses like FMEA.